CHW Live / October 29, 2019 / 03:22 p.m.

← Full thread

TTC staff confirm the only Ontario Line design work done to date is conceptual. The contractor who wins the bid will be responsible for geotechnical design, etc. OL is “between zero and ten percent design” now, which is a hell of a spread.

03:22 p.m.81
View on X →← Back to October 29, 2019
October 29, 2019 — CHW Live