City Hall Watcher
City Hall Watcher
June 15, 2022Jun 15, 2022, 11:30 a.m.

Toigo says it’s not totally impossible to do through-service, but design issues make it extremely difficult. “I’m sure [Metrolinx] considered how to connect the Eglinton East in, but I don’t think they truly engaged with us to advance our need for the Eglinton East LRT,” he adds

← Back to June 15, 2022