Here’s a map of the new Eglinton East LRT, ending at Kennedy. The big issue with the original through-service plan: the Scarborough subway tunnel “was not designed to support the load of the EELRT tunnel” on top of it. I’m not an engineer, but that sounds bad.

03:12 p.m.♡ 23↺ 3