Chow says she wants to make sure the signal priority is entirely in place and working on the surface section of Eglinton before the LRT (finally) opens. "I do not want to see Eglinton Crosstown to be fast underground but slow above ground."
05:04 p.m.♡ 26↺ 2↩ 1